Structural steel fabrication

   

Our company has track record of proven leadership in building the equipment for customers and has worked with the best and the biggest companies in their fields in India. Below is the list of major BHEL, ABB, CROMPTON GREAVES, EMCO, ALSTOM, GUJRAT AMBUJA CEMENT & GEBR. PFEIFFER (INDIA) fabrication order executed during last few years.

   
Terms Fabricated Inspection Agency Code of Construction Typical features of job Single Piece Weight Involved
MSR Pressure Vessels for Nuclear 236 MW Turbine Nuclear
(NPC)
ASME Sec. VIII Division-I a) Large Pressure Vessels having 4 meter dia x 13 meter long.
b) 100% Radiographic weld joints
c) S.S. Tube expansion
d) Hydraulic Testing at 10kg. / Cm2 of the vessels requiring 2.5 lakhs liters of water.
40 Tons
Pressure Vessels LLOYDS BS-5500 a) Pressure vessels having 40 mm Plate thickness.
b) 100% Radiographic welds after Stress Relieving.
c) Hydraulic Testing at 75 kg/Cm2
07 Tons
Pressure Vessels LLOYDS BS-5500 a) Pressure vessels having 40 mm Plate thickness.
b) 100% Radiographic welds after Stress Relieving.
c) Hydraulic Testing at 75 kg/Cm2
13 Tons
L.P. Cylinder for 210 MW Steam Turbine NPC ASME Sec. VIII Division – I a) Large fabricated assy. having 9 Meter length x 4 meter width 3 meter height.
b) Heavy thickness of plats material upto 300mm involved
52 Tons
Stay Ring & Spirals for Hydro Turbine Bureau ASME Sec. VIII
Division – I
a) Large fabricated assy. having 9 Meter dia & spirals having 8 meter dia.
b) 100% Radiographic welds.
c) Typical matching work Involved.
46 Tons
R/E Joint Flange & Pipe Work 315 MVA NTPC & LLOYDS ASME Sec. VIII Division – I a) Butt welds of 200 mm thick plates having 100% radiography involved after S/R.
b) High degree of fabrication skill required.
13 Tons
Transformer Tanks & Pipe Work 498 MVA NTPC ASME Sec. VIII Division a) Large tanks having close dimensional tolerances and involving high degree of matching work between Tank. Accessories & pipe work.
b) Vacuum Testing and pressure testing of Tanks involved.